A non-serial schedule would result if ___ is allowed

7. A non-serial schedule would result if ___ is allowed.

  1. Leaving
  2. Inter-leaving
  3. Intra-leaving
  4. None of the above

Answer: B) Inter-leaving

Explanation:

A non-serial schedule would result if interleaving is allowed.

Comments and Discussions!

Load comments ↻






Copyright © 2024 www.includehelp.com. All rights reserved.