1. Your software or mobile app can be tracked with Jira, a ___ tracking tool.

  1. Bug
  2. Data
  3. Software
  4. None

Answer: A) Bug

Explanation:

Your software or mobile app can be tracked with Jira, a bug-tracking tool.

Discuss this Question


2. Which of the following is TRUE about Jira?

  1. It is a very effective tool for managing defects.
  2. Defects/issues are tracked and managed using it.
  3. Provides a lifecycle process for issues and defects.
  4. All of the above

Answer: D) All of the above

Explanation:

The following are TRUE about Jira -

  1. It is a very effective tool for managing defects.
  2. Defects/issues are tracked and managed using it.
  3. Provides a lifecycle process for issues and defects.

Discuss this Question


3. Software releases are ____ using the JIRA bug-tracking tool.

  1. Monitored
  2. Organized
  3. Prioritized
  4. All of the above

Answer: D) All of the above

Explanation:

Software releases are monitored, organized, and prioritized using the JIRA bug-tracking tool.

Discuss this Question


4. You can view tasks like Open tasks, Closed tasks, and Resolved tasks using the ____ in the JIRA tool.

  1. Pie Chart Max
  2. Pie Chart Min
  3. Pie Chart Macro
  4. Pie Chart Mode

Answer: C) Pie Chart Macro

Explanation:

You can view tasks like Open tasks, Closed tasks, and Resolved tasks using the pie chart macro in the JIRA tool.

Discuss this Question


5. The JIRA tool comes bundled with ____, which measures document-related time.

  1. Tempo Timesheets
  2. Temp Timesheets
  3. Time Temposheets
  4. Time Temp Sheets

Answer: A) Tempo Timesheets

Explanation:

The JIRA tool comes bundled with Tempo Timesheets, which measure document-related time.

Discuss this Question


6. With just a few clicks, you can connect directly to the issues using the ____ provided by JIRA.

  1. Conflict pages
  2. Confluence pages
  3. Conflom pages
  4. Configure pages

Answer: B) Confluence pages

Explanation:

With just a few clicks, you can connect directly to the issues using the Confluence pages provided by JIRA.

Discuss this Question


7. As projects go through the workflows, they are entered into a ____ database using JIRA.

  1. Central
  2. Decentral
  3. Rational
  4. Irrational

Answer: A) Central

Explanation:

As projects go through the workflows, they are entered into a central database using JIRA.

Discuss this Question


8. The waterfall Model consist of the following phases -

  1. Requirements
  2. Design
  3. Development
  4. Testing
  5. Deployment
  6. Maintenance

Select the correct order of the phases -

  1. i > ii > iii > iv > vi > v
  2. i > ii > iv > iii > v > vi
  3. i > ii > iii > iv > v > vi
  4. i > iii > ii > iv > v > vi

Answer: D) All of the above

Explanation:

Waterfall Model consists of the following phases in this order -

  1. Requirements
  2. Design
  3. Development
  4. Testing
  5. Deployment
  6. Maintenance

Discuss this Question


9. Which of the following is the longest phase in the waterfall model?

  1. Requirements
  2. Design
  3. Development
  4. Testing

Answer: C) Development

Explanation:

Development phase is the longest phase in the waterfall model.

Discuss this Question


10. What is/are the advantage(s) of the Waterfall Model?

  1. Simple to use and easy to understand
  2. Specific deliverable and review process
  3. Phases do not overlap
  4. All of the above

Answer: D) All of the above

Explanation:

The advantages of the Waterfall Model are -

  1. Simple to use and easy to understand
  2. Specific deliverable and review process
  3. Phases do not overlap

Discuss this Question


11. What is/are the disadvantage(s) of the Waterfall Model?

  1. Time to market is high
  2. Unexpected results
  3. Not suitable for changing requirements
  4. All of the above

Answer: D) All of the above

Explanation:

The disadvantages of the Waterfall Model are -

  1. Time to market is high
  2. Unexpected results
  3. Not suitable for changing requirements

Discuss this Question


12. Rather than building everything all at once, agile projects are ____ built using time-boxed, iterative methods.

  1. Incrementally
  2. Decrementally
  3. Both A and B
  4. None of the above

Answer: C) Both A and B

Explanation:

Rather than building everything all at once, agile projects are incrementally built using time-boxed, iterative methods.

Discuss this Question


13. What is NOT Agile?

  1. Conducting meetings
  2. Requirements changing anytime
  3. Unstructured development
  4. All of the above

Answer: D) All of the above

Explanation:

The NOT Agile are -

  1. Conducting meetings
  2. Requirements changing anytime
  3. Unstructured development
  4. No documentation

Discuss this Question


14. What is TRUE about Agile?

  1. An agile approach to software development is a philosophy based on values and principles.
  2. Iterative-incremental methodologies are at the core of agile development.
  3. Both A and B
  4. None of the above

Answer: C) Both A and B

Explanation:

The TRUE about Agile are -

  1. An agile approach to software development is a philosophy based on values and principles.
  2. Iterative-incremental methodologies are at the core of agile development.

Discuss this Question


15. Which of the following should be given higher priority in values?

  1. Individuals and interactions
  2. Over processes and tools
  3. Over comprehensive documentation
  4. Over contract negotiation

Answer: A) Individuals and interactions

Explanation:

Individuals and interactions should be given higher priority in values.

Discuss this Question


16. Which of the following should be given lower priority in values?

  1. Working software
  2. Customer collaboration
  3. Responding to change
  4. Over following a plan

Answer: D) Over following a plan

Explanation:

Over-following a plan should be given lower priority in values.

Discuss this Question


17. The delivery of valuable software to our customers is our ____ priority according to agile principles.

  1. Highest
  2. Lowest
  3. Average
  4. Minimal

Answer: A) Highest

Explanation:

The delivery of valuable software to our customers is our highest priority according to agile principles.

Discuss this Question


18. Agile frameworks like ____ allow you to plan, iterate and continue a project.

  1. Scrum
  2. Sprint
  3. Scrum Master
  4. Scrum development team

Answer: A) Scrum

Explanation:

Agile frameworks like Scrum allow you to plan, iterate, and continue a project.

Discuss this Question


19. Product development in scrum is done in ____, which are iterations.

  1. Sprints
  2. Parts
  3. Both A and B
  4. None of the above

Answer: C) Both A and B

Explanation:

Product development in scrum is done in sprints or parts, which are iterations.

Discuss this Question


20. Scrum teams finish the set amount of work during sprints, which are ____ periods.

  1. Time-boxed
  2. Time-set
  3. Time-sign
  4. Time-buffer

Answer: A) Time-boxed

Explanation:

Scrum teams finish the set amount of work during sprints, which are time-boxed periods.

Discuss this Question


21. ____ are facilitators or servant leaders on Scrum teams.

  1. Scrums
  2. Scrum Masters
  3. Scrum development teams
  4. Sprint

Answer: B) Scrum Masters

Explanation:

Scrum Masters are facilitators or servant leaders on Scrum teams.

Discuss this Question


22. Scrum development teams consist of ____.

  1. Developers
  2. Quality assurance specialists
  3. Scrum Masters
  4. All of the above

Answer: D) All of the above

Explanation:

Scrum development teams consist of developers, quality assurance specialists, and scrum masters.

Discuss this Question


23. As part of scrum, ____ are documents and stuff prepared.

  1. Arts
  2. Artifacts
  3. Artisoles
  4. Artsoles

Answer: B) Artifacts

Explanation:

As part of scrum, artifacts are documents and stuff prepared.

Discuss this Question


24. How many artifacts are there in scrum?

  1. 2
  2. 3
  3. 4
  4. 5

Answer: B) 3

Explanation:

There are 3 artifacts in the scrum.

Discuss this Question


25. Which of the following is/are the artifact(s) in scrum?

  1. Product backlog
  2. Sprint backlog
  3. Burndown Chart
  4. All of the above

Answer: D) All of the above

Explanation:

The following are the artifacts in the scrum -

  1. Product backlog
  2. Sprint backlog
  3. Burndown Chart

Discuss this Question


26. Scrums are typically broken up into '_' sprints, and a sprint's goal is to deliver small functionality to the client for demonstration as quickly as possible.

  1. n
  2. n-1
  3. n-2
  4. n-3

Answer: A) n

Explanation:

Scrums are typically broken up into 'n' sprints, and a sprint's goal is to deliver small functionality to the client for demonstration as quickly as possible.

Discuss this Question


27. There is ____ product backlog per 'n' sprint backlogs.

  1. One
  2. Two
  3. Three
  4. Four

Answer: A) One

Explanation:

There is one product backlog per 'n' sprint backlogs.

Discuss this Question


28. How many scrum roles are there?

  1. 2
  2. 3
  3. 4
  4. 5

Answer: B) 3

Explanation:

There are 3 scrum roles.

Discuss this Question


29. Which of the following is/are the scrum role(s)?

  1. Product Owner
  2. Scrum Master
  3. Team
  4. All of the above

Answer: D) All of the above

Explanation:

The following are the scrum roles -

  1. Product Owner
  2. Scrum Master
  3. Team

Discuss this Question


30. We talk about Agile or Scrum teams instead of individual ____ when we discuss these approaches.

  1. Developers
  2. Testers
  3. Both A and B
  4. None of the above

Answer: C) Both A and B

Explanation:

We talk about Agile or Scrum teams instead of individual developers or testers when we discuss these approaches.

Discuss this Question


31. Which of the following is/are the scrum ceremony/ies?

  1. Sprint Planning
  2. Daily Scrum
  3. Sprint Review
  4. All of the above

Answer: D) All of the above

Explanation:

The following are the scrum ceremonies -

  1. Sprint Planning
  2. Daily Scrum
  3. Sprint Review

Discuss this Question


32. During sprint ____, our team also selects the activities or backlogs that will be developed during this sprint, and these backlogs are referred to as sprint backlogs.

  1. Planning
  2. Backlog
  3. Activity
  4. Scrum

Answer: A) Planning

Explanation:

During sprint planning, our team also selects the activities or backlogs that will be developed during this sprint, and these backlogs are referred to as sprint backlogs..

Discuss this Question


33. The Scrum Master conducts a daily meeting called ____ Scrum when sprints begin.

  1. Daily
  2. Weekly
  3. Monthly
  4. Yearly

Answer: A) Daily

Explanation:

The Scrum Master conducts a daily meeting called Daily Scrum when sprints begin.

Discuss this Question


34. Two types of meetings are held after sprint delivery, namely sprint ____.

  1. Reviews
  2. Retrospectives
  3. Both A and B
  4. None of the above

Answer: C) Both A and B

Explanation:

Two types of meetings are held after sprint delivery, namely sprint reviews and retrospectives.

Discuss this Question


35. In this sprint, ____ backlogs consist of some of the items from the product backlog that has to be completed.

  1. Product
  2. Sprint
  3. Scrum
  4. None

Answer: B) Sprint

Explanation:

In this sprint, sprint backlogs consist of some of the items from the product backlog that has to be completed.

Discuss this Question


36. How many statuses does the scrum board consist of?

  1. 2
  2. 3
  3. 4
  4. 5

Answer: C) 4

Explanation:

There are 4 statuses in the scrum board.

Discuss this Question


37. Which of the following is/are the statuses of the scrum board?

  1. Open
  2. Testing
  3. Closed
  4. All of the above

Answer: D) All of the above

Explanation:

The following are the statuses of the scrum board -

  1. Open
  2. Testing
  3. Closed
  4. In progress

Discuss this Question


38. When the status is '____', the available tasks have not yet begun.

  1. Open
  2. In progress
  3. Testing
  4. Closed

Answer: A) Open

Explanation:

When the status is 'Open', the available tasks have not yet begun.

Discuss this Question


39. What is/are the characteristics of the Kanban Methodology?

  1. Flexibility
  2. Minimize time cycles
  3. Visual metrics
  4. All of the above

Answer: D) All of the above

Explanation:

The characteristics of the Kanban Methodology are -

  1. Flexibility
  2. Minimize time cycles
  3. Visual metrics

Discuss this Question


40. Work that is '____' is the focus of a Kanban team.

  1. Open
  2. In Progress
  3. Testing
  4. Closed

Answer: B) In Progress

Explanation:

Work that is 'in progress' is the focus of a Kanban team.

Discuss this Question


41. How many types of charts are used by the kanban team?

  1. 2
  2. 3
  3. 4
  4. 5

Answer: A) 2

Explanation:

There are 2 types of charts used by the kanban team.

Discuss this Question


42. Which of the following is/are the type(s) of charts used by the kanban team?

  1. Control charts
  2. Cumulative flow diagrams
  3. Both A and B
  4. None of the above

Answer: C) Both A and B

Explanation:

The following are the types of charts used by the kanban team -

  1. Control charts
  2. Cumulative flow diagrams

Discuss this Question


43. Using ____, you can see how long it takes each issue to be resolved.

  1. Control charts
  2. Cumulative flow diagrams
  3. Both A and B
  4. None of the above

Answer: A) Control charts

Explanation:

Using control charts, you can see how long it takes each issue to be resolved.

Discuss this Question


44. How many states can the Kanban board consist of?

  1. 2
  2. 3
  3. 4
  4. 5

Answer: B) 3

Explanation:

Kanban board consists of 3 states.

Discuss this Question


45. Which of the following is/are the state(s) of the Kanban Board?

  1. To Do
  2. Doing
  3. Done
  4. All of the above

Answer: D) All of the above

Explanation:

The following states are there in Kanban Board -

  1. To Do
  2. Doing
  3. Done

Discuss this Question


46. A project's '____' state is created when all product backlog items are started.

  1. To Do
  2. Doing
  3. Done
  4. None

Answer: A) To Do

Explanation:

A project's 'To Do' state is created when all product backlog items are started.

Discuss this Question


47. A member of the team enters the '____' state when they begin working on an activity.

  1. To Do
  2. Doing
  3. Done
  4. None

Answer: B) Doing

Explanation:

A member of the team enters the 'Doing' state when they begin working on an activity

Discuss this Question


48. How many issue types are there in Jira?

  1. 2
  2. 3
  3. 4
  4. 5

Answer: B) 3

Explanation:

There are 3 types of issues in Jira.

Discuss this Question


49. Which of the following is/are the type(s) of issues in Jira?

  1. Jira Core Default Issue Types
  2. Jira Software Default Issue Types
  3. Jira Service Desk Default Issue Types
  4. All of the above

Answer: D) All of the above

Explanation:

The following are the types of issues in Jira -

  1. Jira Core Default Issue Types
  2. Jira Software Default Issue Types
  3. Jira Service Desk Default Issue Types

Discuss this Question


50. Which of the following is/are the Jira Core Default Issue Type(s)?

  1. Task
  2. Subtask
  3. Both A and B
  4. None of the above

Answer: C) Both A and B

Explanation:

The following are the Jira Core Default Issue Types -

  1. Task
  2. Subtask

Discuss this Question


51. Which of the following is/are the Jira Software Default Issue Type(s)?

  1. Story
  2. Bug
  3. Epic
  4. All of the above

Answer: D) All of the above

Explanation:

The following are the Jira Software Default Issue Types -

  1. Story
  2. Bug
  3. Epic

Discuss this Question


52. Which of the following is/are the Jira Service Desk Default Issue Type(s)?

  1. Incident
  2. Service Request
  3. Change
  4. All of the above

Answer: D) All of the above

Explanation:

The following are the Jira Service Desk Default Issue Types -

  1. Incident
  2. Service Request
  3. Change
  4. Problem

Discuss this Question


53. Why Issue Types?

  1. A team usually consists of multiple work items, which are differentiated based on the issue type.
  2. Fields, screens, and workflows can differ for each Issue type.
  3. Issue types can be reported separately.
  4. All of the above

Answer: D) All of the above

Explanation:

Issue Types because -

  1. A team usually consists of multiple work items, which are differentiated based on the issue type.
  2. Fields, screens, and workflows can differ for each Issue type.
  3. Issue types can be reported separately

Discuss this Question


54. What is/are TRUE about Subtask?

  1. There must be a parent issue for a subtask.
  2. By assigning each task to the team members, it converts a problem into manageable tasks.
  3. In comparison to the parent issue, the subtask is more technical.
  4. All of the above

Answer: D) All of the above

Explanation:

The things TRUE about Subtask are -

  1. There must be a parent issue for a subtask.
  2. By assigning each task to the team members, it converts a problem into manageable tasks.
  3. In comparison to the parent issue, the subtask is more technical

Discuss this Question


55. What is/are the characteristics of Subtask?

  1. Fields and issue keys are unique to each subtask.
  2. Workflow status is independent for subtasks.
  3. There are a number of issue types that can be converted into subtask issues.
  4. All of the above

Answer: D) All of the above

Explanation:

The characteristics of Subtask are -

  1. Fields and issue keys are unique to each subtask.
  2. Workflow status is independent for subtasks.
  3. There are a number of issue types that can be converted into subtask issues

Discuss this Question


56. During the lifecycle of an issue, ____ consists of a number of activities that track the status and progress of that issue.

  1. Workflow
  2. Backlog
  3. Scrum Board
  4. Board

Answer: A) Workflow

Explanation:

During the lifecycle of an issue, workflow consists of a number of activities that track the status and progress of that issue.

Discuss this Question


57. The workflow in the Jira tool is divided into the following phase(s):

  1. TODO State
  2. In Progress State
  3. Done State
  4. All of the above

Answer: D) All of the above

Explanation:

The workflow in the Jira tool is divided into the following phases:

  1. TODO State
  2. In Progress State
  3. Done State

Discuss this Question


58. Which of the following activity/ies is/are performed in the TODO state?

  1. Issue Creation
  2. Summary and additional details
  3. Both A and B
  4. None of the above

Answer: C) Both A and B

Explanation:

The following activities are performed in the TODO state -

  1. Issue Creation
  2. Summary and additional details

Discuss this Question


59. As part of the issue creation process, you will need to provide some additional information such as the ____, components affected, subtasks, upload screenshots, and the email history associated with an issue.

  1. Issue Description
  2. Priority
  3. Severity
  4. All of the above

Answer: D) All of the above

Explanation:

As part of the issue creation process, you will need to provide some additional information such as the issue description, priority, severity, components affected, subtasks, upload screenshots, and the email history associated with an issue.

Discuss this Question


60. Which of the following activity/ies is/are performed in the Progress state?

  1. Assignee
  2. Work Review
  3. Quality Analysis
  4. All of the above

Answer: D) All of the above

Explanation:

The following activities are performed in the Progress state -

  1. Assignee
  2. Work Review
  3. Quality Analysis

Discuss this Question


61. Which of the following activity/ies is/are performed in the Done state?

  1. Release
  2. Production
  3. Release to production
  4. All of the above

Answer: C) Release to production

Explanation:

Release to production activity is performed in the Done state.

Discuss this Question


62. Jira's ____ is the first screen you see after logging in.

  1. Board
  2. Dashboard
  3. Scrum Board
  4. Kanban

Answer: B) Dashboard

Explanation:

Jira's Dashboard is the first screen you see after logging in.

Discuss this Question


63. ____ can customize the Dashboard, and based on their roles, can access Jira.

  1. Editors
  2. Managers
  3. Administrators
  4. Viewers

Answer: C) Administrators

Explanation:

Administrators can customize the Dashboard, and based on their roles, can access Jira.

Discuss this Question


64. ____, bud, epics, or other work can be represented as issues.

  1. Feature requests
  2. Tasks
  3. Subtasks
  4. All of the above

Answer: D) All of the above

Explanation:

Feature requests, tasks, subtasks, bud, epics, or other work can be represented as issues.

Discuss this Question


65. Defining the ____ as the work that is needed to achieve the goal of the team is essential.

  1. Task
  2. Subtask
  3. Raw Task
  4. Stealth Task

Answer: A) Task

Explanation:

Defining the task as the work that is needed to achieve the goal of the team is essential.

Discuss this Question


66. ____ refer to all tasks under a logged issue.

  1. Tasks
  2. Subtasks
  3. Raw Tasks
  4. Stealth Tasks

Answer: B) Subtasks

Explanation:

Subtasks refer to all tasks under a logged issue.

Discuss this Question


67. An error in the function of a product is known as a ___.

  1. Bug
  2. Epic
  3. Story
  4. Change

Answer: A) Bug

Explanation:

An error in the function of a product is known as a bug.

Discuss this Question


68. A user story that is too large is broken into smaller stories called ____.

  1. Epic
  2. Story
  3. Change
  4. Incident

Answer: A) Epic

Explanation:

A user story that is too large is broken into smaller stories called epics

Discuss this Question


69. Work hierarchy refers to Epic as being at the ___.

  1. Bottom
  2. Middle
  3. Top
  4. Median

Answer: C) Top

Explanation:

Work hierarchy refers to Epic as being at the top.

Discuss this Question


70. A ____ describes each task that needs to be completed in a project.

  1. Epic
  2. Story
  3. Change
  4. Incident

Answer: B) Story

Explanation:

A story describes each task that needs to be completed in a project.

Discuss this Question


71. ____ are a list of activities or issues the team must resolve within a certain timeframe.

  1. Backlogs
  2. Scrum Board
  3. Create Sprint
  4. Sprint

Answer: A) Backlogs

Explanation:

Backlogs are a list of activities or issues the team must resolve within a certain timeframe.

Discuss this Question


72. Among the multiple activities in ____ backlog are creating and updating issues, dragging and dropping the issues to prioritize them, assigning them to sprints, epics, versions, and managing epics.

  1. Sprint
  2. Scrum
  3. Epic
  4. Story

Answer: B) Scrum

Explanation:

Among the multiple activities in the scrum backlog are creating and updating issues, dragging and dropping the issues to prioritize them, assigning them to sprints, epics, versions, and managing epics.

Discuss this Question


73. Which of the following activity/ies can be performed in the scrum backlog?

  1. Create subtasks
  2. Transition an issue
  3. Find issue
  4. All of the above

Answer: D) All of the above

Explanation:

The following activities can be performed in the scrum backlog -

  1. Create subtasks
  2. Transition an issue
  3. Find issue

Discuss this Question


74. An incremental-iterative delivery process is achieved with ____.

  1. Jira Scrum Boards
  2. Jira Sprint Boards
  3. Jira Epic Boards
  4. Jira Story Boards

Answer: A) Jira Scrum Boards

Explanation:

An incremental-iterative delivery process is achieved with Jira Scrum Boards.

Discuss this Question


75. What is/are the function(s) of Scrum Board?

  1. Increase communication and transparency
  2. Promote sprint planning and iterative development
  3. Improve team focus and organization
  4. All of the above

Answer: D) All of the above

Explanation:

The functions of Scrum Board are -

  1. Increase communication and transparency
  2. Promote sprint planning and iterative development
  3. Improve team focus and organization

Discuss this Question


76. Sprints are time-boxed iterations that are usually _ weeks long.

  1. 2
  2. 3
  3. 4
  4. 5

Answer: A) 2

Explanation:

Sprints are time-boxed iterations that are usually 2 weeks long.

Discuss this Question


77. An item in the product backlog may be ____, or an experiment.

  1. A feature
  2. A defect
  3. An enhancement
  4. All of the above

Answer: D) All of the above

Explanation:

An item in the product backlog may be a feature, a defect, an enhancement, or an experiment.

Discuss this Question


78. An agile framework consists of ____.

  1. Issues
  2. Epics
  3. User stories
  4. Swimlanes

Answer: C) User stories

Explanation:

An agile framework consists of user stories.

Discuss this Question


79. In a scrum board or kanban board, ____ are used to categorize issues during an active sprint.

  1. Issues
  2. Epics
  3. Swimlanes
  4. None

Answer: C) Swimlanes

Explanation:

In a scrum board or kanban board, swimlanes are used to categorize issues during an active sprint.

Discuss this Question


80. As part of the ____ process, the team is required to resolve a set of issues within a specified period of time.

  1. Scrum
  2. Sprint
  3. Issue
  4. Story

Answer: B) Sprint

Explanation:

As part of the sprint process, the team is required to resolve a set of issues within a specified period of time.

Discuss this Question


81. You can ____ progress on work using a board, which displays all issues within a project.

  1. View
  2. Manage
  3. Report
  4. All of the above

Answer: D) All of the above

Explanation:

You can view, manage, and report progress on work using a board, which displays all issues within a project.

Discuss this Question


82. How many types of boards exist in Jira?

  1. 2
  2. 3
  3. 4
  4. 5

Answer: B) 3

Explanation:

3 types of boards exist in Jira.

Discuss this Question


83. Which of the following is/are the type of board(s) that exist in Jira?

  1. Next-gen
  2. Scrum
  3. Kanban
  4. All of the above

Answer: D) All of the above

Explanation:

The following are the types of boards that exist in Jira -

  1. Next-gen
  2. Scrum
  3. Kanban

Discuss this Question


84. An agile newcomer can benefit from the ____ board.

  1. Next-gen
  2. Scrum
  3. Kanban
  4. None

Answer: A) Next-gen

Explanation:

An agile newcomer can benefit from the next-generation board.

Discuss this Question


85. A next-generation board is ____.

  1. Straight-forward
  2. Streamlined
  3. Simplified
  4. All of the above

Answer: D) All of the above

Explanation:

A next-generation board is streamlined, streamlined, and simplified.

Discuss this Question


86. Designed for maximizing efficiency, Kanban boards allow you to ____.

  1. Visualize work
  2. Limit work-in-progress
  3. Limit wasted time
  4. All of the above

Answer: D) All of the above

Explanation:

Designed for maximizing efficiency, Kanban boards allow you to visualize work, limit work-in-progress, and limit wasted time.

Discuss this Question


87. In how many parts is the scrum board divided into?

  1. 2
  2. 3
  3. 4
  4. 5

Answer: B) 3

Explanation:

Scrum board is divided into 3 parts.

Discuss this Question


88. Which of the following is the part into which the scrum board is divided into?

  1. Backlog
  2. Active Sprint
  3. Reports
  4. All of the above

Answer: D) All of the above

Explanation:

The following are the parts into which the scrum board is divided into -

  1. Backlog
  2. Active Sprint
  3. Reports

Discuss this Question


89. There are a variety of ways to create and update issues in the ____, such as dragging and dropping issues and assigning them to sprints as well as ranking them.

  1. Scrum Backlog
  2. Scrum Active Sprint
  3. Scrum Reports
  4. Sprint Backlog

Answer: A) Scrum Backlog

Explanation:

There are a variety of ways to create and update issues in the scrum backlog, such as dragging and dropping issues and assigning them to sprints as well as ranking them.

Discuss this Question


90. A sprint in which current issues are being worked on constitutes an ____ sprint.

  1. Active
  2. Passive
  3. Both A and B
  4. None of the above

Answer: A) Active

Explanation:

A sprint in which current issues are being worked on constitutes an active sprint.

Discuss this Question


91. As opposed to planning iterations, ____ frameworks continuously monitor the flow of work, so that new tasks are added when the current ones are completed.

  1. Sprint
  2. Scrum
  3. Kanban
  4. None

Answer: C) Kanban

Explanation:

As opposed to planning iterations, Kanban frameworks continuously monitor the flow of work, so that new tasks are added when the current ones are completed.

Discuss this Question


92. There are the following template(s) for next-generation projects:

  1. Next-gen Scrum
  2. Next-gen Kanban
  3. Both A and B
  4. None of the above

Answer: C) Both A and B

Explanation:

There are the following templates for next-generation projects -

  1. Next-gen Scrum
  2. Next-gen Kanban

Discuss this Question


93. What is the full form of SDLC?

  1. Software Development Life Cycle
  2. Software Development Life Circle
  3. Session Development Life Cycle
  4. Session Development Life Circle

Answer: A) Software Development Life Cycle

Explanation:

The full form of SDLC is Software Development Life Cycle.

Discuss this Question


94. In which of the following stage(s) can the bug be opened?

  1. Duplicate
  2. Rejected
  3. Deferred
  4. All of the above

Answer: D) All of the above

Explanation:

The bug can be opened in the following stages -

  1. Duplicate
  2. Rejected
  3. Deferred

Discuss this Question


95. In the case of ____ defects or defects that correspond to the same concept as previous bugs, the status is set to duplicate.

  1. Duplicate
  2. Rejected
  3. Deferred
  4. None

Answer: A) Duplicate

Explanation:

In the case of duplicate defects or defects that correspond to the same concept as previous bugs, the status is set to duplicate.

Discuss this Question


96. Bugs that cannot be fixed in the next release are labeled as ____ as they are not of higher priority.

  1. Duplicate
  2. Deferred
  3. Rejected
  4. None

Answer: B) Deferred

Explanation:

Bugs that cannot be fixed in the next release are labeled as Deferred as they are not of higher priority.

Discuss this Question


97. Deferred state is also known as -

  1. Rejected
  2. Postpone
  3. Both A and B
  4. None of the above

Answer: B) Postpone

Explanation:

The deferred state is also known as Postpone state.

Discuss this Question


98. What is/are the advantage(s) of Jira software?

  1. Functional testing can be done using Jira.
  2. Prioritizing tasks is done using it.
  3. As the Jira tool provides better visibility, users can easily see the next build release.
  4. All of the above

Answer: D) All of the above

Explanation:

The advantages of Jira software are -

  1. Functional testing can be done using Jira.
  2. Prioritizing tasks is done using it.
  3. As the Jira tool provides better visibility, users can easily see the next build release.

Discuss this Question


99. Bugzilla was developed in -

  1. 1998
  2. 1999
  3. 2000
  4. 2001

Answer: A) 1998

Explanation:

Bugzilla was developed in 1998.

Discuss this Question


100. What is/are the advantage(s) of Bugzilla?

  1. Product quality has improved as a result.
  2. Testing and development teams are able to communicate more effectively through it.
  3. Adaptability is one of its strongest characteristics.
  4. All of the above

Answer: D) All of the above

Explanation:

The advantages of Bugzilla are -

  1. Product quality has improved as a result.
  2. Testing and development teams are able to communicate more effectively through it.
  3. Adaptability is one of its strongest characteristics.

Discuss this Question


101. Jira epic can be created from -

  1. New Issue
  2. Epic Panel
  3. Both A and B
  4. None of the above

Answer: C) Both A and B

Explanation:

Jira epic can be created from New issues as well as Epic Panel.

Discuss this Question


102. Project and filter average ages are shown in an ____ age report.

  1. Average
  2. Median
  3. Mode
  4. Middle

Answer: A) Average

Explanation:

Project and filter average ages are shown in an average age report.

Discuss this Question





Comments and Discussions!

Load comments ↻






Copyright © 2024 www.includehelp.com. All rights reserved.