Home »
MCQs
Jira Multiple-Choice Questions (MCQs)
Jira is a proprietary issue tracking product developed by Atlassian that allows bug tracking and agile project management.
Jira MCQs: This section contains multiple-choice questions and answers on the various topics of Jira. Practice these MCQs to test and enhance your skills on Jira.
List of Jira MCQs
1. Your software or mobile app can be tracked with Jira, a ___ tracking tool.
- Bug
- Data
- Software
- None
Answer: A) Bug
Explanation:
Your software or mobile app can be tracked with Jira, a bug-tracking tool.
Discuss this Question
2. Which of the following is TRUE about Jira?
- It is a very effective tool for managing defects.
- Defects/issues are tracked and managed using it.
- Provides a lifecycle process for issues and defects.
- All of the above
Answer: D) All of the above
Explanation:
The following are TRUE about Jira -
- It is a very effective tool for managing defects.
- Defects/issues are tracked and managed using it.
- Provides a lifecycle process for issues and defects.
Discuss this Question
3. Software releases are ____ using the JIRA bug-tracking tool.
- Monitored
- Organized
- Prioritized
- All of the above
Answer: D) All of the above
Explanation:
Software releases are monitored, organized, and prioritized using the JIRA bug-tracking tool.
Discuss this Question
4. You can view tasks like Open tasks, Closed tasks, and Resolved tasks using the ____ in the JIRA tool.
- Pie Chart Max
- Pie Chart Min
- Pie Chart Macro
- Pie Chart Mode
Answer: C) Pie Chart Macro
Explanation:
You can view tasks like Open tasks, Closed tasks, and Resolved tasks using the pie chart macro in the JIRA tool.
Discuss this Question
5. The JIRA tool comes bundled with ____, which measures document-related time.
- Tempo Timesheets
- Temp Timesheets
- Time Temposheets
- Time Temp Sheets
Answer: A) Tempo Timesheets
Explanation:
The JIRA tool comes bundled with Tempo Timesheets, which measure document-related time.
Discuss this Question
6. With just a few clicks, you can connect directly to the issues using the ____ provided by JIRA.
- Conflict pages
- Confluence pages
- Conflom pages
- Configure pages
Answer: B) Confluence pages
Explanation:
With just a few clicks, you can connect directly to the issues using the Confluence pages provided by JIRA.
Discuss this Question
7. As projects go through the workflows, they are entered into a ____ database using JIRA.
- Central
- Decentral
- Rational
- Irrational
Answer: A) Central
Explanation:
As projects go through the workflows, they are entered into a central database using JIRA.
Discuss this Question
8. The waterfall Model consist of the following phases -
- Requirements
- Design
- Development
- Testing
- Deployment
- Maintenance
Select the correct order of the phases -
- i > ii > iii > iv > vi > v
- i > ii > iv > iii > v > vi
- i > ii > iii > iv > v > vi
- i > iii > ii > iv > v > vi
Answer: D) All of the above
Explanation:
Waterfall Model consists of the following phases in this order -
- Requirements
- Design
- Development
- Testing
- Deployment
- Maintenance
Discuss this Question
9. Which of the following is the longest phase in the waterfall model?
- Requirements
- Design
- Development
- Testing
Answer: C) Development
Explanation:
Development phase is the longest phase in the waterfall model.
Discuss this Question
10. What is/are the advantage(s) of the Waterfall Model?
- Simple to use and easy to understand
- Specific deliverable and review process
- Phases do not overlap
- All of the above
Answer: D) All of the above
Explanation:
The advantages of the Waterfall Model are -
- Simple to use and easy to understand
- Specific deliverable and review process
- Phases do not overlap
Discuss this Question
11. What is/are the disadvantage(s) of the Waterfall Model?
- Time to market is high
- Unexpected results
- Not suitable for changing requirements
- All of the above
Answer: D) All of the above
Explanation:
The disadvantages of the Waterfall Model are -
- Time to market is high
- Unexpected results
- Not suitable for changing requirements
Discuss this Question
12. Rather than building everything all at once, agile projects are ____ built using time-boxed, iterative methods.
- Incrementally
- Decrementally
- Both A and B
- None of the above
Answer: C) Both A and B
Explanation:
Rather than building everything all at once, agile projects are incrementally built using time-boxed, iterative methods.
Discuss this Question
13. What is NOT Agile?
- Conducting meetings
- Requirements changing anytime
- Unstructured development
- All of the above
Answer: D) All of the above
Explanation:
The NOT Agile are -
- Conducting meetings
- Requirements changing anytime
- Unstructured development
- No documentation
Discuss this Question
14. What is TRUE about Agile?
- An agile approach to software development is a philosophy based on values and principles.
- Iterative-incremental methodologies are at the core of agile development.
- Both A and B
- None of the above
Answer: C) Both A and B
Explanation:
The TRUE about Agile are -
- An agile approach to software development is a philosophy based on values and principles.
- Iterative-incremental methodologies are at the core of agile development.
Discuss this Question
15. Which of the following should be given higher priority in values?
- Individuals and interactions
- Over processes and tools
- Over comprehensive documentation
- Over contract negotiation
Answer: A) Individuals and interactions
Explanation:
Individuals and interactions should be given higher priority in values.
Discuss this Question
16. Which of the following should be given lower priority in values?
- Working software
- Customer collaboration
- Responding to change
- Over following a plan
Answer: D) Over following a plan
Explanation:
Over-following a plan should be given lower priority in values.
Discuss this Question
17. The delivery of valuable software to our customers is our ____ priority according to agile principles.
- Highest
- Lowest
- Average
- Minimal
Answer: A) Highest
Explanation:
The delivery of valuable software to our customers is our highest priority according to agile principles.
Discuss this Question
18. Agile frameworks like ____ allow you to plan, iterate and continue a project.
- Scrum
- Sprint
- Scrum Master
- Scrum development team
Answer: A) Scrum
Explanation:
Agile frameworks like Scrum allow you to plan, iterate, and continue a project.
Discuss this Question
19. Product development in scrum is done in ____, which are iterations.
- Sprints
- Parts
- Both A and B
- None of the above
Answer: C) Both A and B
Explanation:
Product development in scrum is done in sprints or parts, which are iterations.
Discuss this Question
20. Scrum teams finish the set amount of work during sprints, which are ____ periods.
- Time-boxed
- Time-set
- Time-sign
- Time-buffer
Answer: A) Time-boxed
Explanation:
Scrum teams finish the set amount of work during sprints, which are time-boxed periods.
Discuss this Question
21. ____ are facilitators or servant leaders on Scrum teams.
- Scrums
- Scrum Masters
- Scrum development teams
- Sprint
Answer: B) Scrum Masters
Explanation:
Scrum Masters are facilitators or servant leaders on Scrum teams.
Discuss this Question
22. Scrum development teams consist of ____.
- Developers
- Quality assurance specialists
- Scrum Masters
- All of the above
Answer: D) All of the above
Explanation:
Scrum development teams consist of developers, quality assurance specialists, and scrum masters.
Discuss this Question
23. As part of scrum, ____ are documents and stuff prepared.
- Arts
- Artifacts
- Artisoles
- Artsoles
Answer: B) Artifacts
Explanation:
As part of scrum, artifacts are documents and stuff prepared.
Discuss this Question
24. How many artifacts are there in scrum?
- 2
- 3
- 4
- 5
Answer: B) 3
Explanation:
There are 3 artifacts in the scrum.
Discuss this Question
25. Which of the following is/are the artifact(s) in scrum?
- Product backlog
- Sprint backlog
- Burndown Chart
- All of the above
Answer: D) All of the above
Explanation:
The following are the artifacts in the scrum -
- Product backlog
- Sprint backlog
- Burndown Chart
Discuss this Question
26. Scrums are typically broken up into '_' sprints, and a sprint's goal is to deliver small functionality to the client for demonstration as quickly as possible.
- n
- n-1
- n-2
- n-3
Answer: A) n
Explanation:
Scrums are typically broken up into 'n' sprints, and a sprint's goal is to deliver small functionality to the client for demonstration as quickly as possible.
Discuss this Question
27. There is ____ product backlog per 'n' sprint backlogs.
- One
- Two
- Three
- Four
Answer: A) One
Explanation:
There is one product backlog per 'n' sprint backlogs.
Discuss this Question
28. How many scrum roles are there?
- 2
- 3
- 4
- 5
Answer: B) 3
Explanation:
There are 3 scrum roles.
Discuss this Question
29. Which of the following is/are the scrum role(s)?
- Product Owner
- Scrum Master
- Team
- All of the above
Answer: D) All of the above
Explanation:
The following are the scrum roles -
- Product Owner
- Scrum Master
- Team
Discuss this Question
30. We talk about Agile or Scrum teams instead of individual ____ when we discuss these approaches.
- Developers
- Testers
- Both A and B
- None of the above
Answer: C) Both A and B
Explanation:
We talk about Agile or Scrum teams instead of individual developers or testers when we discuss these approaches.
Discuss this Question
31. Which of the following is/are the scrum ceremony/ies?
- Sprint Planning
- Daily Scrum
- Sprint Review
- All of the above
Answer: D) All of the above
Explanation:
The following are the scrum ceremonies -
- Sprint Planning
- Daily Scrum
- Sprint Review
Discuss this Question
32. During sprint ____, our team also selects the activities or backlogs that will be developed during this sprint, and these backlogs are referred to as sprint backlogs.
- Planning
- Backlog
- Activity
- Scrum
Answer: A) Planning
Explanation:
During sprint planning, our team also selects the activities or backlogs that will be developed during this sprint, and these backlogs are referred to as sprint backlogs..
Discuss this Question
33. The Scrum Master conducts a daily meeting called ____ Scrum when sprints begin.
- Daily
- Weekly
- Monthly
- Yearly
Answer: A) Daily
Explanation:
The Scrum Master conducts a daily meeting called Daily Scrum when sprints begin.
Discuss this Question
34. Two types of meetings are held after sprint delivery, namely sprint ____.
- Reviews
- Retrospectives
- Both A and B
- None of the above
Answer: C) Both A and B
Explanation:
Two types of meetings are held after sprint delivery, namely sprint reviews and retrospectives.
Discuss this Question
35. In this sprint, ____ backlogs consist of some of the items from the product backlog that has to be completed.
- Product
- Sprint
- Scrum
- None
Answer: B) Sprint
Explanation:
In this sprint, sprint backlogs consist of some of the items from the product backlog that has to be completed.
Discuss this Question
36. How many statuses does the scrum board consist of?
- 2
- 3
- 4
- 5
Answer: C) 4
Explanation:
There are 4 statuses in the scrum board.
Discuss this Question
37. Which of the following is/are the statuses of the scrum board?
- Open
- Testing
- Closed
- All of the above
Answer: D) All of the above
Explanation:
The following are the statuses of the scrum board -
- Open
- Testing
- Closed
- In progress
Discuss this Question
38. When the status is '____', the available tasks have not yet begun.
- Open
- In progress
- Testing
- Closed
Answer: A) Open
Explanation:
When the status is 'Open', the available tasks have not yet begun.
Discuss this Question
39. What is/are the characteristics of the Kanban Methodology?
- Flexibility
- Minimize time cycles
- Visual metrics
- All of the above
Answer: D) All of the above
Explanation:
The characteristics of the Kanban Methodology are -
- Flexibility
- Minimize time cycles
- Visual metrics
Discuss this Question
40. Work that is '____' is the focus of a Kanban team.
- Open
- In Progress
- Testing
- Closed
Answer: B) In Progress
Explanation:
Work that is 'in progress' is the focus of a Kanban team.
Discuss this Question
41. How many types of charts are used by the kanban team?
- 2
- 3
- 4
- 5
Answer: A) 2
Explanation:
There are 2 types of charts used by the kanban team.
Discuss this Question
42. Which of the following is/are the type(s) of charts used by the kanban team?
- Control charts
- Cumulative flow diagrams
- Both A and B
- None of the above
Answer: C) Both A and B
Explanation:
The following are the types of charts used by the kanban team -
- Control charts
- Cumulative flow diagrams
Discuss this Question
43. Using ____, you can see how long it takes each issue to be resolved.
- Control charts
- Cumulative flow diagrams
- Both A and B
- None of the above
Answer: A) Control charts
Explanation:
Using control charts, you can see how long it takes each issue to be resolved.
Discuss this Question
44. How many states can the Kanban board consist of?
- 2
- 3
- 4
- 5
Answer: B) 3
Explanation:
Kanban board consists of 3 states.
Discuss this Question
45. Which of the following is/are the state(s) of the Kanban Board?
- To Do
- Doing
- Done
- All of the above
Answer: D) All of the above
Explanation:
The following states are there in Kanban Board -
- To Do
- Doing
- Done
Discuss this Question
46. A project's '____' state is created when all product backlog items are started.
- To Do
- Doing
- Done
- None
Answer: A) To Do
Explanation:
A project's 'To Do' state is created when all product backlog items are started.
Discuss this Question
47. A member of the team enters the '____' state when they begin working on an activity.
- To Do
- Doing
- Done
- None
Answer: B) Doing
Explanation:
A member of the team enters the 'Doing' state when they begin working on an activity
Discuss this Question
48. How many issue types are there in Jira?
- 2
- 3
- 4
- 5
Answer: B) 3
Explanation:
There are 3 types of issues in Jira.
Discuss this Question
49. Which of the following is/are the type(s) of issues in Jira?
- Jira Core Default Issue Types
- Jira Software Default Issue Types
- Jira Service Desk Default Issue Types
- All of the above
Answer: D) All of the above
Explanation:
The following are the types of issues in Jira -
- Jira Core Default Issue Types
- Jira Software Default Issue Types
- Jira Service Desk Default Issue Types
Discuss this Question
50. Which of the following is/are the Jira Core Default Issue Type(s)?
- Task
- Subtask
- Both A and B
- None of the above
Answer: C) Both A and B
Explanation:
The following are the Jira Core Default Issue Types -
- Task
- Subtask
Discuss this Question
51. Which of the following is/are the Jira Software Default Issue Type(s)?
- Story
- Bug
- Epic
- All of the above
Answer: D) All of the above
Explanation:
The following are the Jira Software Default Issue Types -
- Story
- Bug
- Epic
Discuss this Question
52. Which of the following is/are the Jira Service Desk Default Issue Type(s)?
- Incident
- Service Request
- Change
- All of the above
Answer: D) All of the above
Explanation:
The following are the Jira Service Desk Default Issue Types -
- Incident
- Service Request
- Change
- Problem
Discuss this Question
53. Why Issue Types?
- A team usually consists of multiple work items, which are differentiated based on the issue type.
- Fields, screens, and workflows can differ for each Issue type.
- Issue types can be reported separately.
- All of the above
Answer: D) All of the above
Explanation:
Issue Types because -
- A team usually consists of multiple work items, which are differentiated based on the issue type.
- Fields, screens, and workflows can differ for each Issue type.
- Issue types can be reported separately
Discuss this Question
54. What is/are TRUE about Subtask?
- There must be a parent issue for a subtask.
- By assigning each task to the team members, it converts a problem into manageable tasks.
- In comparison to the parent issue, the subtask is more technical.
- All of the above
Answer: D) All of the above
Explanation:
The things TRUE about Subtask are -
- There must be a parent issue for a subtask.
- By assigning each task to the team members, it converts a problem into manageable tasks.
- In comparison to the parent issue, the subtask is more technical
Discuss this Question
55. What is/are the characteristics of Subtask?
- Fields and issue keys are unique to each subtask.
- Workflow status is independent for subtasks.
- There are a number of issue types that can be converted into subtask issues.
- All of the above
Answer: D) All of the above
Explanation:
The characteristics of Subtask are -
- Fields and issue keys are unique to each subtask.
- Workflow status is independent for subtasks.
- There are a number of issue types that can be converted into subtask issues
Discuss this Question
56. During the lifecycle of an issue, ____ consists of a number of activities that track the status and progress of that issue.
- Workflow
- Backlog
- Scrum Board
- Board
Answer: A) Workflow
Explanation:
During the lifecycle of an issue, workflow consists of a number of activities that track the status and progress of that issue.
Discuss this Question
57. The workflow in the Jira tool is divided into the following phase(s):
- TODO State
- In Progress State
- Done State
- All of the above
Answer: D) All of the above
Explanation:
The workflow in the Jira tool is divided into the following phases:
- TODO State
- In Progress State
- Done State
Discuss this Question
58. Which of the following activity/ies is/are performed in the TODO state?
- Issue Creation
- Summary and additional details
- Both A and B
- None of the above
Answer: C) Both A and B
Explanation:
The following activities are performed in the TODO state -
- Issue Creation
- Summary and additional details
Discuss this Question
59. As part of the issue creation process, you will need to provide some additional information such as the ____, components affected, subtasks, upload screenshots, and the email history associated with an issue.
- Issue Description
- Priority
- Severity
- All of the above
Answer: D) All of the above
Explanation:
As part of the issue creation process, you will need to provide some additional information such as the issue description, priority, severity, components affected, subtasks, upload screenshots, and the email history associated with an issue.
Discuss this Question
60. Which of the following activity/ies is/are performed in the Progress state?
- Assignee
- Work Review
- Quality Analysis
- All of the above
Answer: D) All of the above
Explanation:
The following activities are performed in the Progress state -
- Assignee
- Work Review
- Quality Analysis
Discuss this Question
61. Which of the following activity/ies is/are performed in the Done state?
- Release
- Production
- Release to production
- All of the above
Answer: C) Release to production
Explanation:
Release to production activity is performed in the Done state.
Discuss this Question
62. Jira's ____ is the first screen you see after logging in.
- Board
- Dashboard
- Scrum Board
- Kanban
Answer: B) Dashboard
Explanation:
Jira's Dashboard is the first screen you see after logging in.
Discuss this Question
63. ____ can customize the Dashboard, and based on their roles, can access Jira.
- Editors
- Managers
- Administrators
- Viewers
Answer: C) Administrators
Explanation:
Administrators can customize the Dashboard, and based on their roles, can access Jira.
Discuss this Question
64. ____, bud, epics, or other work can be represented as issues.
- Feature requests
- Tasks
- Subtasks
- All of the above
Answer: D) All of the above
Explanation:
Feature requests, tasks, subtasks, bud, epics, or other work can be represented as issues.
Discuss this Question
65. Defining the ____ as the work that is needed to achieve the goal of the team is essential.
- Task
- Subtask
- Raw Task
- Stealth Task
Answer: A) Task
Explanation:
Defining the task as the work that is needed to achieve the goal of the team is essential.
Discuss this Question
66. ____ refer to all tasks under a logged issue.
- Tasks
- Subtasks
- Raw Tasks
- Stealth Tasks
Answer: B) Subtasks
Explanation:
Subtasks refer to all tasks under a logged issue.
Discuss this Question
67. An error in the function of a product is known as a ___.
- Bug
- Epic
- Story
- Change
Answer: A) Bug
Explanation:
An error in the function of a product is known as a bug.
Discuss this Question
68. A user story that is too large is broken into smaller stories called ____.
- Epic
- Story
- Change
- Incident
Answer: A) Epic
Explanation:
A user story that is too large is broken into smaller stories called epics
Discuss this Question
69. Work hierarchy refers to Epic as being at the ___.
- Bottom
- Middle
- Top
- Median
Answer: C) Top
Explanation:
Work hierarchy refers to Epic as being at the top.
Discuss this Question
70. A ____ describes each task that needs to be completed in a project.
- Epic
- Story
- Change
- Incident
Answer: B) Story
Explanation:
A story describes each task that needs to be completed in a project.
Discuss this Question
71. ____ are a list of activities or issues the team must resolve within a certain timeframe.
- Backlogs
- Scrum Board
- Create Sprint
- Sprint
Answer: A) Backlogs
Explanation:
Backlogs are a list of activities or issues the team must resolve within a certain timeframe.
Discuss this Question
72. Among the multiple activities in ____ backlog are creating and updating issues, dragging and dropping the issues to prioritize them, assigning them to sprints, epics, versions, and managing epics.
- Sprint
- Scrum
- Epic
- Story
Answer: B) Scrum
Explanation:
Among the multiple activities in the scrum backlog are creating and updating issues, dragging and dropping the issues to prioritize them, assigning them to sprints, epics, versions, and managing epics.
Discuss this Question
73. Which of the following activity/ies can be performed in the scrum backlog?
- Create subtasks
- Transition an issue
- Find issue
- All of the above
Answer: D) All of the above
Explanation:
The following activities can be performed in the scrum backlog -
- Create subtasks
- Transition an issue
- Find issue
Discuss this Question
74. An incremental-iterative delivery process is achieved with ____.
- Jira Scrum Boards
- Jira Sprint Boards
- Jira Epic Boards
- Jira Story Boards
Answer: A) Jira Scrum Boards
Explanation:
An incremental-iterative delivery process is achieved with Jira Scrum Boards.
Discuss this Question
75. What is/are the function(s) of Scrum Board?
- Increase communication and transparency
- Promote sprint planning and iterative development
- Improve team focus and organization
- All of the above
Answer: D) All of the above
Explanation:
The functions of Scrum Board are -
- Increase communication and transparency
- Promote sprint planning and iterative development
- Improve team focus and organization
Discuss this Question
76. Sprints are time-boxed iterations that are usually _ weeks long.
- 2
- 3
- 4
- 5
Answer: A) 2
Explanation:
Sprints are time-boxed iterations that are usually 2 weeks long.
Discuss this Question
77. An item in the product backlog may be ____, or an experiment.
- A feature
- A defect
- An enhancement
- All of the above
Answer: D) All of the above
Explanation:
An item in the product backlog may be a feature, a defect, an enhancement, or an experiment.
Discuss this Question
78. An agile framework consists of ____.
- Issues
- Epics
- User stories
- Swimlanes
Answer: C) User stories
Explanation:
An agile framework consists of user stories.
Discuss this Question
79. In a scrum board or kanban board, ____ are used to categorize issues during an active sprint.
- Issues
- Epics
- Swimlanes
- None
Answer: C) Swimlanes
Explanation:
In a scrum board or kanban board, swimlanes are used to categorize issues during an active sprint.
Discuss this Question
80. As part of the ____ process, the team is required to resolve a set of issues within a specified period of time.
- Scrum
- Sprint
- Issue
- Story
Answer: B) Sprint
Explanation:
As part of the sprint process, the team is required to resolve a set of issues within a specified period of time.
Discuss this Question
81. You can ____ progress on work using a board, which displays all issues within a project.
- View
- Manage
- Report
- All of the above
Answer: D) All of the above
Explanation:
You can view, manage, and report progress on work using a board, which displays all issues within a project.
Discuss this Question
82. How many types of boards exist in Jira?
- 2
- 3
- 4
- 5
Answer: B) 3
Explanation:
3 types of boards exist in Jira.
Discuss this Question
83. Which of the following is/are the type of board(s) that exist in Jira?
- Next-gen
- Scrum
- Kanban
- All of the above
Answer: D) All of the above
Explanation:
The following are the types of boards that exist in Jira -
- Next-gen
- Scrum
- Kanban
Discuss this Question
84. An agile newcomer can benefit from the ____ board.
- Next-gen
- Scrum
- Kanban
- None
Answer: A) Next-gen
Explanation:
An agile newcomer can benefit from the next-generation board.
Discuss this Question
85. A next-generation board is ____.
- Straight-forward
- Streamlined
- Simplified
- All of the above
Answer: D) All of the above
Explanation:
A next-generation board is streamlined, streamlined, and simplified.
Discuss this Question
86. Designed for maximizing efficiency, Kanban boards allow you to ____.
- Visualize work
- Limit work-in-progress
- Limit wasted time
- All of the above
Answer: D) All of the above
Explanation:
Designed for maximizing efficiency, Kanban boards allow you to visualize work, limit work-in-progress, and limit wasted time.
Discuss this Question
87. In how many parts is the scrum board divided into?
- 2
- 3
- 4
- 5
Answer: B) 3
Explanation:
Scrum board is divided into 3 parts.
Discuss this Question
88. Which of the following is the part into which the scrum board is divided into?
- Backlog
- Active Sprint
- Reports
- All of the above
Answer: D) All of the above
Explanation:
The following are the parts into which the scrum board is divided into -
- Backlog
- Active Sprint
- Reports
Discuss this Question
89. There are a variety of ways to create and update issues in the ____, such as dragging and dropping issues and assigning them to sprints as well as ranking them.
- Scrum Backlog
- Scrum Active Sprint
- Scrum Reports
- Sprint Backlog
Answer: A) Scrum Backlog
Explanation:
There are a variety of ways to create and update issues in the scrum backlog, such as dragging and dropping issues and assigning them to sprints as well as ranking them.
Discuss this Question
90. A sprint in which current issues are being worked on constitutes an ____ sprint.
- Active
- Passive
- Both A and B
- None of the above
Answer: A) Active
Explanation:
A sprint in which current issues are being worked on constitutes an active sprint.
Discuss this Question
91. As opposed to planning iterations, ____ frameworks continuously monitor the flow of work, so that new tasks are added when the current ones are completed.
- Sprint
- Scrum
- Kanban
- None
Answer: C) Kanban
Explanation:
As opposed to planning iterations, Kanban frameworks continuously monitor the flow of work, so that new tasks are added when the current ones are completed.
Discuss this Question
92. There are the following template(s) for next-generation projects:
- Next-gen Scrum
- Next-gen Kanban
- Both A and B
- None of the above
Answer: C) Both A and B
Explanation:
There are the following templates for next-generation projects -
- Next-gen Scrum
- Next-gen Kanban
Discuss this Question
93. What is the full form of SDLC?
- Software Development Life Cycle
- Software Development Life Circle
- Session Development Life Cycle
- Session Development Life Circle
Answer: A) Software Development Life Cycle
Explanation:
The full form of SDLC is Software Development Life Cycle.
Discuss this Question
94. In which of the following stage(s) can the bug be opened?
- Duplicate
- Rejected
- Deferred
- All of the above
Answer: D) All of the above
Explanation:
The bug can be opened in the following stages -
- Duplicate
- Rejected
- Deferred
Discuss this Question
95. In the case of ____ defects or defects that correspond to the same concept as previous bugs, the status is set to duplicate.
- Duplicate
- Rejected
- Deferred
- None
Answer: A) Duplicate
Explanation:
In the case of duplicate defects or defects that correspond to the same concept as previous bugs, the status is set to duplicate.
Discuss this Question
96. Bugs that cannot be fixed in the next release are labeled as ____ as they are not of higher priority.
- Duplicate
- Deferred
- Rejected
- None
Answer: B) Deferred
Explanation:
Bugs that cannot be fixed in the next release are labeled as Deferred as they are not of higher priority.
Discuss this Question
97. Deferred state is also known as -
- Rejected
- Postpone
- Both A and B
- None of the above
Answer: B) Postpone
Explanation:
The deferred state is also known as Postpone state.
Discuss this Question
98. What is/are the advantage(s) of Jira software?
- Functional testing can be done using Jira.
- Prioritizing tasks is done using it.
- As the Jira tool provides better visibility, users can easily see the next build release.
- All of the above
Answer: D) All of the above
Explanation:
The advantages of Jira software are -
- Functional testing can be done using Jira.
- Prioritizing tasks is done using it.
- As the Jira tool provides better visibility, users can easily see the next build release.
Discuss this Question
99. Bugzilla was developed in -
- 1998
- 1999
- 2000
- 2001
Answer: A) 1998
Explanation:
Bugzilla was developed in 1998.
Discuss this Question
100. What is/are the advantage(s) of Bugzilla?
- Product quality has improved as a result.
- Testing and development teams are able to communicate more effectively through it.
- Adaptability is one of its strongest characteristics.
- All of the above
Answer: D) All of the above
Explanation:
The advantages of Bugzilla are -
- Product quality has improved as a result.
- Testing and development teams are able to communicate more effectively through it.
- Adaptability is one of its strongest characteristics.
Discuss this Question
101. Jira epic can be created from -
- New Issue
- Epic Panel
- Both A and B
- None of the above
Answer: C) Both A and B
Explanation:
Jira epic can be created from New issues as well as Epic Panel.
Discuss this Question
102. Project and filter average ages are shown in an ____ age report.
- Average
- Median
- Mode
- Middle
Answer: A) Average
Explanation:
Project and filter average ages are shown in an average age report.
Discuss this Question